More 2nd Floor Work

The photos in the gallery are from Tuesday Dec 28 and Saturday Dec 31. Work on the 2nd floor continues as they build the peaks for the roof.

Photo Gallery.

2nd Floor Deck

Moving along... 2nd floor deck is almost complete and the 1st floor is taking shape

Photos...

1st Floor Begins

The first floor is taking shape and the ceiling is being constructed for the second floor.

Photos here...

Walls Up!

Stopped by Friday... the first floor walls are almost up!!!!

Photos here!

Electrical

Met with the appriser and at the same time was able to catch the electrical conduit trench. There’s also a photo of the trench to the well.

Photos here.

Foundation Complete & Framing Begins

Last week the foundation construction was completed. This included adding the moisture barrier and footing drainage system. After the Building Inspector reviewed the progress the drainage was covered in stone and a fabric mesh and the foundation was backfilled. The site was also graded with the remaining material. More stone was brought in and the basement was filled as well as the basement stairwell.

This past weekend in anticipation of the upcoming snow forecast for Monday the framing began. The crew was able to frame the subfloor and get it covered before the snow.

Photos of the final steps to the foundation are here.

Photos of the framing are here.