Mar 2017
Trim Delivered
Wed, March 22, 2017
Trim delivered today... work starts next week. Note that trim material is from WindsorOne - they make excellent trim and their pre-prime coat is nice and heavy. Also delivered were the oak stair treads, hand rail and hardware.
Photos here.
Photos here.
1st Coat of Paint
Fri, March 17, 2017
Frame the following photos like this... Monday no work, Tuesday Blizzard, Wednesday supplies delivered, Thursday paint, Friday first coat of painting complete. Holy moly!
The room colors are all Benjamin Moore eggshell finish (trim will be semigloss).
Power Room = Van Alen Green
Master Bed = Heaven on Earth Blue
Master Bath = Green Wave
All other rooms = Clay Beige (same beige as our existing house)
Trim work begins next week!
Enjoy the photos
The room colors are all Benjamin Moore eggshell finish (trim will be semigloss).
Power Room = Van Alen Green
Master Bed = Heaven on Earth Blue
Master Bath = Green Wave
All other rooms = Clay Beige (same beige as our existing house)
Trim work begins next week!
Enjoy the photos
Septic & Fireplace
Sun, March 12, 2017
The septic system was backfilled and is now complete. I’m not sure what the two 4-in PVC pipes are for; they are approx. in line with the leaching trenches, but are not shown on the septic plan drawings.
Also installed recently was the fireplace. Note that excess heat can be transferred to the basement.
The house is toasty warm with only two heaters running to dry the plaster - although it’s still quite humid.
Enjoy the photos.
Also installed recently was the fireplace. Note that excess heat can be transferred to the basement.
The house is toasty warm with only two heaters running to dry the plaster - although it’s still quite humid.
Enjoy the photos.
Plaster - Begining to end
Thu, March 09, 2017
At the start of this week they had completed some plastering upstairs and by today (Thursday) they were done. Also worked on this week was the septic system.
There are two days of photos here, Sat March 4 and Thurs March 9. Enjoy!
There are two days of photos here, Sat March 4 and Thurs March 9. Enjoy!
Plastering Begins
Thu, March 02, 2017
The plastering has begun. They have started upstairs where most of the seams have been plastered. The rear guest bedroom appears to have its first coat completed. The master bedroom is a staging area for the second floor work. Outside they’ve begun to dig the holes and trenching for the septic system. Also installed were the window wells. Oh, and it looks like a considerable amount of front yard grading have been completed.
Enjoy the photos...
Enjoy the photos...