Rough Plumbing & More
Mon, January 30, 2017
Friday (1/27) the rough plumbing began as they cut the holes for the piping.
Saturday I spent a couple of hours walking thru the house with the electrician to discuss the layout of different fixtures. We also discussed switch control (2-way, 3-way, dimmer, etc). After Karen finished with her hair appointment (and since Linda was feeling better) we all went over to share the progress and test out different light fixture sizes. Later Saturday night we purchased the exterior lights that will be located on the front door, garage area, and rear of the house.
Today (1/30) I met with Mike and Jose to discuss the design of the front porch. Jose, the mason, provided us some samples to review this evening.
Siding to start on Wednesday.
Here are the photos from the last few days.
Saturday I spent a couple of hours walking thru the house with the electrician to discuss the layout of different fixtures. We also discussed switch control (2-way, 3-way, dimmer, etc). After Karen finished with her hair appointment (and since Linda was feeling better) we all went over to share the progress and test out different light fixture sizes. Later Saturday night we purchased the exterior lights that will be located on the front door, garage area, and rear of the house.
Today (1/30) I met with Mike and Jose to discuss the design of the front porch. Jose, the mason, provided us some samples to review this evening.
Siding to start on Wednesday.
Here are the photos from the last few days.